CONSTRUCTION AND
DEVELOPEMENT
TOP LINE:
- Client: Seahawk Cove SH, LLC
- Project Type: Student Housing
- Completion Date: 2023
- Number of Buildings: 2
- Total Units: 24 (12 per building)
- Building Size: 13,950 sq. ft. per building
- Unit Configuration: Each unit consists of 3 bedrooms and 3 bathrooms with a shared living space.
LOCATION:
- Wilmington, NC
Project Overview
Seahawk Cove Phase II represents a significant milestone in the continued development of student housing in Wilmington, NC. Constructed in 2023 for Seahawk Cove SH, LLC, this project consisted of two ground-up apartment buildings designed to meet the growing demand for student accommodation at the University of North Carolina Wilmington (UNCW). This phase follows the successful completion of the original Seahawk Cove project in 2017.
Design and Construction
The Seahawk Cove Phase II project aimed to enhance the existing student housing facilities by adding two modern, well-equipped apartment buildings. Each building spans 13,950 square feet, offering a total of 24 units, with 12 units per building. These units are specifically designed for student living, featuring three bedrooms and three bathrooms in each unit, along with a communal living space to foster a sense of community among residents.
The design focused on creating a comfortable, functional, and aesthetically pleasing environment that caters to the unique needs of students. Modern amenities, energy-efficient systems, and high-quality materials were utilized to ensure durability and sustainability.
Construction Process
The construction of Seahawk Cove Phase II was executed with meticulous planning and precision. Key phases of the construction process included:
-
Site Preparation: Ensuring the site was ready for construction by clearing, grading, and establishing a solid foundation.
-
Foundation and Framing: Constructing the structural framework of the buildings to ensure stability and safety.
-
Mechanical, Electrical, and Plumbing (MEP): Installing all necessary systems to provide essential services like heating, cooling, water, and electricity.
-
Interior and Exterior Finishes: Applying high-quality materials and finishes to both the interior and exterior, enhancing the aesthetic appeal and functionality of the buildings.
Challenges and Solutions
The project faced several challenges, including coordinating construction activities within a bustling university environment and adhering to a strict timeline to ensure the buildings were ready for occupancy before the start of the academic year. Our team employed strategic planning and efficient project management techniques to overcome these challenges, ensuring timely and successful project completion.
Outcome and Impact
Seahawk Cove Phase II has significantly contributed to the availability of high-quality student housing in Wilmington, NC. The additional units have eased the housing shortage for UNCW students, providing them with modern, comfortable living spaces that support their academic and social needs. The project’s successful completion underscores our commitment to delivering top-tier construction solutions that meet the unique demands of our clients and the communities they serve.
Here’s What Our Customer Said
![]()
We contracted with Leeward late 2023 on a $5M multifamily project. Even though there were permitting delays, they were able to complete the project on time and on budget. They went above and beyond to meet their original timeline and didn’t nickel and dime us for overtime or change orders. If you’re doing ground up construction, you want these guys on your team. They are fair and the quality of work is top notch.
– Steeve Breton , Seahawk Cove SH, LLC
![]()
Leeward Construction was great all around. On time (actually early if you can believe that), and on budget with our large student housing project. We expected them to be professional, experienced, and well-respected in the industry…and that’s what we got. Our team not only recommends them – we will be using them on our next project.
– Eric Upchurch , Seahawk Cove SH, LLC
Conclusion
Seahawk Cove Phase II exemplifies our dedication to excellence in construction and our ability to deliver projects that enhance community infrastructure. We are proud to have played a role in supporting the UNCW student community and look forward to future opportunities to contribute to Wilmington’s development.